COLLEGE OF CHEMISTRY
Seismic Project Photo Gallery

Click on the name of the photo to see a larger print then click on your "back" button to return to the gallery.


Hildebrandsteel.jpg
Hildebrand steel
Hilderbandbraces.jpg
Hilderband braces
packedforshipping.jpg
packed for shipping
steelbraces.jpg
steel braces
Hildsouth.JPG
Hild. south, 5/20
Lateast.JPG
Latimer east, 5/20
Latsouth.JPG
Latimer south, 5/20
1ConcreteTruck.JPG
Concrete Truck
2StartingPour.JPG
Starting Pour
3ReadyToPour.JPG
Ready To Pour
ConcretePour.JPG
Concrete Pour
ConcretePour2.JPG
Concrete Pour
ConcretePour3.JPG
Concrete Pour
Footing.JPG
Footing
FootingPour.JPG
Footing Pour
FreshConcrete.JPG
Fresh Concrete
LatimerNorth.JPG
Latimer North
LatimerNorth2.JPG
Latimer North
PimentelAccess.JPG
Pimentel Access
01chemPlaza.JPG
Chemistry Plaza
02chemPlaza2.JPG
Chemistry Plaza
03BreezewayProtect.JPG
Breezeway Protection
04BikeStorage.JPG
Temporary Bike Storage
05ProtectedPassage.JPG
Protecting Passage
13LatLobby.JPG
Latimer Lobby
07LatMastClimbers.JPG
Mast Climbers, Latimer
08MastClimbersLat.JPG
Mast Climbers, Latimer
09B50TanDrillRig.JPG
D50 Tan, Drill Rig
10D50DrillRig.JPG
D50 Tan, Drill Rig
11D4LatTrench.JPG
D4 Latimer, Trench
12LatimerLobby.JPG
Latimer Lobby
Digging.JPG
Digging Hildebrand South
14BuildingABridge.JPG
Building A Bridge
15HildebrandSouth.JPG
Hildebrand, South
16SouthDrive.JPG
South Drive
17TrenchHildSouth.JPG
Hildebrand, South
18BuildingShearwall.JPG
Building A Shearwall
19HildShearWall.JPG
Hild Shearwall
20HildShearwalls.JPG
Hild Shearwalls
21SettingShearwall.JPG
Setting A Shearwall
22Shearwall.JPG
Shearwall
23Shearwall2.JPG
Shearwall
24ShearwallConst.JPG
Shearwall Construction
25ShearwallRebars.JPG
Shearwall Rebars
26Shearwalls.JPG
Shearwalls
BldgMgr_ProfMgr.JPG
Building Mgr & Project Mgr
06ConstrcTeam.JPG
Hild. Construction Team



Click here to return to the College of Chemistry Seismic Retrofit Project homepage.